| Description |
The objective of this project was to provide a description of wave and
current energy generating device systems and subsystems and provide a
functional taxonomy; identify criteria pertinent to the design,
construction, installation, maintenance and operations of these systems,
and review the criteria to determine applicability, adequacy, and
suitability; identify existing codes and standards that can be applied
to these devices; conduct a regulatory gap analysis; and recommend
regulatory initiatives or approaches for addressing identified
deficiencies. |
| Progress |
Completed. |
| Report |
| AA |
Wave And Current Energy Generating Devices Criteria And
Standards, June 2009 by PCCI, INC., Alexandria, VA |
|
|
|
|