| Project Number |
300 |
| Date of Summary |
July 01, 2001 |
| Subject |
Coiled-Tubing and Slim-Hole
Technology, DEA-67 Phase III |
| Performing Activity |
Maurer Engineering |
| Principal Investigator |
Mr. Mel Hightower |
| Contracting Agency |
Minerals Management Service |
| Estimated Completion |
Complete |
| Description |
The
24-month project 1) reviewed all aspects of coiled- tubing drilling,
completion, production, and workover technology, 2) updated existing PC
programs, and 3) developed new PC programs needed by participants to
overcome field problems. Information for the reports was obtained from
technical literature, field tests, service companies, operators, and
laboratory tests. The objective of the project was to keep participants
abreast of the latest technical developments in coiled-tubing technology and
to assist them in implementing this technology into their operations. |
| Progress |
The JIP
sponsored the Coiled-Tubing Inspection Workshop which was held on September
22, 1999. Several MMS personnel attended this workshop. A second workshop
was held on March 7, 2000 in Aberdeen. Both workshops were well attended and
additional workshops are in the planning stage. A third workshop was held on
September 27, 2000. |
| Report |
|
AA
(50 pages) |
Cement Wellbore
Cementing Model Version 2 User's Manual Phase II Maurer Engineering Inc.
TR97-13 September 1997 |
|
AB
(34 pages) |
CT Growth Coiled -
Tubing Diametral Growth Model Version 1 User's Manual Maure Engineering
TR97- 13 June 1998. |
|
AC
(88 pages) |
CTPRO
Coiled - Tubing Professional Package Version 1 User's Manual Maurer
Engineering TR98 - 14 June 1998. |
|
AD
(144 pages) |
Wellbore
Hydraulics Model (HYDMOD3) Theory and User's Manual Maurer Engineering
TR96-39 October 1996. |
|
AE
(86 pages) |
Multiphase Flow
Production Model (PROMOD1) Theory and User's Manual Maurer Engineering
TR94-12 January 1994. |
|
AF
(74 pages) |
Well Control Model
(WELCON2) Theory and User's Manual Maurer Engineering TR93-2 February 1993 |
|
AG
(120 pages) |
Casting String Design
Model (CASING2) Theory and User's Manual Maurer Engineering TR96-29 October
1996. |
|
AH
(102 pages) |
Wellbore
Thermal Simulation Model (GTEMP1) Theory and User's Manual Maurer
Engineering TR96-1 January 1996. |
|
AI
(460 pages) |
Coiled Tubing Technology
(1995-1998) Project to Devolop and Evaluate Coiled-Tubing and Slim-Hole
Technology Maurer Engineering TR98-10 April 1998 |
|
AJ
(314 pages) |
Slim
Hole Technology (1994-1995) Maurer Engineering TR95-29 September 1995. |
|
AK
(338 pages) |
Slim-Hole Drilling and
Completion Barriers Final Report (July 1993-April 1995) Maurer Engineering
May 1995. |
|
AL
(294 pages) |
Slim-Hole Technology
(1995-1998) Maurer Engineering TR98-9 April 1998. |
|
AM
(458 pages) |
Coiled-Tubing Technology
(1993-1994) Maurer Engineering TR95-11 May 1995. |
|
AN
(48 pages) |
Tubular Buckling and
Lockup Model (BUCKLE1) Theory and User's Manual Maurer Engineering TR93-15
August 1993. |
|
AO
(78 pages) |
Coiled-Tubing Stress
Analysis Model (CSTRESS1) Stress/Drag/Hydraulics/Buckling Theory and User's
Manual Maurer Engineering TR93-11 August 1993. |
|
AP
(44 pages) |
CTDRAG
Coiled-Tubing Drag Model Version 1 User's Manual Maurer Engineering TR97-26
November 1997. |
|
AQ
(62 pages) |
Coiled Tubing Fatigue
Model (CTLIFE2) Theory and User's Manual Maurer Engineering TR96-37 October
1996. |
|
AR
(24 pages) |
Triaxial Stress Analysis Model (TRIAX 1) Theory and
Users Manual Maurer Engineering TR93-3 February 1993. |