Topic Indices and Site Maps Search - Bureau of Ocean Energy Management, Regulation and Enforcement Home - Bureau of Ocean Energy Management, Regulation and Enforcement Bureau of Ocean Energy Management, Regulation and Enforcement
 
 
Technology Assessment & Research (TA&R) Projects Listed by Number
Technology Assessment & Research (TA&R) Program
Technology Assessment & Research (TA&R) International Activities
Oil Spill Response Research Program
Renewable Energy Research
Renewable Energy Test Tank
Operational Safety and Engineering Research
Technology Assessment & Research (TA&R) Projects Listed by Category
Technology Assessment & Research (TA&R) Workshops
How to Request Technology Assessment & Research (TA&R) Reports
How to Submit Research Proposals
Offshore Energy and Minerals Management Homepage
5-Year OCS Leasing Program
Environmental Stewardship
ECON
GOMESA Revenue Sharing
International Activities
Coastal Impact Assistance Program (CIAP)
Jobs
Leasing
Mapping and Data
Leasing Moratorium Information
Offshore Safety
Offshore Stats & Facts
Operations
Past 5-Year Programs
Penalties
Regulatory Compliance
Renewable Energy Program
Research
Resource Evaluation
2006 National Assssment
2006 National Assessment Map
Contact Us
Navy Spacer
Alaska Region
Atlantic
Gulf of Mexico
Pacific Region
Navy Spacer
 
 Hot Topics:

   NEW Reforms


   Ocean Energy
   Safety Advisory
   Committee

   Notice to Lessees

   Well Permits and
   Plans

   Investigations and
   Review Unit

   Deepwater Horizon
   Library & Reading
   Room

 

Navy Spacer
 
 Contact:
    OEMM Web Team

 
Navy Spacer
 
Technology Assessment & Research (TA&R) Program
 
Project Number 280
Date of Summary April 01, 1999
Subject Risk Assessment for Dry Tree Tieback Alternatives Study
Performing Activity Aker Engineering
Principal Investigator Riley G. Goldsmith
Contracting Agency Minerals Management Service
Estimated Completion Completed
Description This project evaluates the risk costs of three alternative design concepts for a deepwater "Dry Tree Tieback" well systems (well systems that extend the wellbore to a Christmas tree located on the production vessel (TLP, Spar)). The three design analyzed are:

1) dual casing riser;

2) single casing riser; and

3) tubing riser.

Each riser system was analyzed at two water depths (4,000'and 6,000'), with two platform types (SPAR and TLP), and with both 6 and 12 wells tied into the platform. Phase I of this study (MMS did not participate) estimated costs for capital expenditure and operating expenditure for different dry tree riser configurations.

Progress Completed. This project evaluated the risk costs of three alternative design concepts for a deepwater "Dry Tree Tieback" well systems (well systems that extend the wellbore to a Christmas tree located on the production vessel (TLP, Spar)). The three design analyzed are:

1) dual casing riser;

2) single casing riser; and

3) tubing riser.

Each riser system was analyzed at two water depths (4000'and 6000'), with two platform types (SPAR and TLP), and with both 6 and 12 wells tied into the platform. Phase I of this study (MMS did not participate) estimated costs for capital expenditure and operating expenditure for different dry tree riser configurations.

The study used fault tree analysis to determine the safety of the three riser designs. All of the scenarios mentioned above were evaluated. The study also looked at both normal producing operations and the safety of well interventions (i.e. workovers). Statistical failure records were used where available, but "engineering judgment " was often used to assign reliability values to components.

Results of the analysis can be summarized as follows: environment. This system benefits from the fact that dual independent barriers exist even without a mud column during well interventions. environment. ( This seemingly counter-intuitive result is explained by the fact that the tubing riser is removed and a separate workover riser is installed for well interventions). environment and the highest calculated total cost.

Report This project is out of print, the reports may not be available for release, at this time.

Last Updated: 12/30/2010, 11:29 AM Central Time