Offshore Energy and Minerals Management Program Home Page
Renewable Energy Program
5-Year OCS Leasing Program
Virginia Sale 220
Leasing Moratorium Information
2006 National Assssment
2006 National Assessment Map
Past 5-Year Programs
Atlantic Seismic EIS
Coastal Impact Assistance Program
Jobs
GOMESA Revenue Sharing

Safety-Related Information
Offshore Stats and Facts
OCS-Related Incidents
Abbreviations and Acronyms
Collisions
Crane Incidents
Fatalities
Fires/Explosion
Incident Reporting
Incident Statistics Summaries
Injuries
Loss of Well Control
Other Incidents
Pipeline Incident
Spills 1996-2011
Spills 1994-1995
spacer
Minerals Commodities Revenue Statistics
Teal Spacer

 Content:
   
David Izon

 Pagemasters:
    OMM Web Team

Teal Spacer
USA.gov Logo: The U.S. Government's Official Web Portal
Teal Spacer

 

Pacific Region

Losses of Well Control – 2004 (1 Total)

November 18 – Veneco, Inc.

MMS Investigation Report: Completed Activity: Development / Production
Lease: P00205 Event(s): Loss of Well Control / Pollution (3 gallons crude oil)
Area: 6B Operation: Workover / Completion
Block: 4661 Cause: Human error
Rig/Platform: Gail Water Depth: 739 ft.

Remarks: A loss of well control was experienced during a workover/ completion operation on Well E-15 when a wellhead service technician removed a 1.5"diameter lockdown pin and packing-gland from the wellhead. Removal of this pin circumvented the blowout prevention system (BOP). Minutes after removing the pin, the ensuing flow turned into a mixture of water and hydrocarbons. The driller closed the annular (bag) BOP after seeing that the well was flowing.

A 2" valve on the 9-5/8" casing was opened to relieve the pressure on the 1.5" pin opening without success. The well was unsecured downhole except for the well completion fluid which was being lost/depleted due to a thief zone within the same formation. The rig continuously pumped completion fluid at a rate of 2.6 barrels/minute, but estimated that they had stopped pumping minutes prior to the incident, to allow visual observation of the tubing hanger through the 1.5" opening.

The deluge system was manually activated. Platform operations were shutdown due to LEL/combustible gas and H2S detector activation in the area of the release. Thirty nine (39) nonessential personnel were evacuated. Twelve (12) essential personnel remained aboard the platform in an attempt to bring the well under control. A spill of approximately 3 gallons of crude oil went into the ocean.

Rig pumps were eventually activated and seawater was pumped into the well at a high rate through the kill line on the BOP stack and after flowing uncontrolled for approximately 2.5 hours the rate of leakage subsided enough to allow the installation of a valve assembly into the 1.5" opening. Valves on this assembly were closed thus eliminating the leak path. See Investigation Report MMS 2005-017.

 