Bureau of Ocean Energy Management, Regulation, and Enforcement (BOEMRE) Search Topic Index About the Bureau of Ocean Energy Management, Regulation, and Enforcement (BOEMRE) What's New U.S. Department of the Interior (DOI)

Bureau of Ocean Energy Management, Regulation, and Enforcement (BOEMRE) ~ Offshore Energy & Minerals Management (OEMM) Home Page

Alaska OCS Region Atlantic OCS Area Gulf of Mexico OCS Region Pacific OCS Region
Offshore Energy and Minerals Management Program Home Page
Renewable Energy Program
5-Year OCS Leasing Program
Virginia Sale 220
Leasing Moratorium Information
2006 National Assssment
2006 National Assessment Map
Past 5-Year Programs
Atlantic Seismic EIS
Coastal Impact Assistance Program
Jobs
GOMESA Revenue Sharing

Safety-Related Information
Offshore Stats and Facts
OCS-Related Incidents
Abbreviations and Acronyms
Collisions
Crane Incidents
Fatalities
Fires/Explosion
Incident Reporting
Incident Statistics Summaries
Injuries
Loss of Well Control
Other Incidents
Pipeline Incident
Spills 1996-2011
Spills 1994-1995
spacer
Minerals Commodities Revenue Statistics
Teal Spacer

 Content:
    David Moore

 Pagemasters:
    OEMM Web Team

Teal Spacer
USA.gov Logo: The U.S. Government's Official Web Portal
Teal Spacer

 

Pacific Region

Fires – 1997

March 17, 1997 - Chevron USA, Inc.

Investigation: Complete Activity: Development
Lease: P00316 Event(s): Fire
Area: 6A Operation: Production
Block: 5584 Cause: Equipment Failure
Rig/Platform: Hermosa Water Depth: 603’

Remarks: A high amp alarm for K-11 electric motor was observed buy the control room operator. Control room notified area operator. On the way to the unit the unit shut down. Both operators observed smoke coming from the motor area. The Head Operator Electrician was notified who dropped out the main circuit breaker. The covers were removed and the motor was inspected. A fire was observed and extinguished with a dry chemical extinguisher, and the motor housing was then cooled with water.


July 25, 1997 - Chevron USA, Inc.

Investigation: Complete Activity: Development
Lease: P00315 Event(s): Fire
Area: 6A Operation: Production
Block: 5585 Cause: Equipment Failure
Rig/Platform: Harvest Water Depth: 675’

Remarks: Operator responded to a ODU that activated near the charge pump area. After investigation evidence of a fire was found at the charge pump. Motor wiring was melted and damaged initial assessment is either a motor wiring short or motor bearing friction.


December 09, 1997 - Exxon Corporation

Investigation: Complete Activity: Development
Lease: P00188 Event(s): Fire
Area: 6A Operation: Production
Block: 5374 Cause: Equipment Failure
Rig/Platform: Hondo Water Depth: 824’

Remarks: Person in control room (20 ft from air compressor) heard noise and came out of control room to investigate. Upon exiting the control room he saw fire on air compressor "A" and used the 350-lb dry chemical extinguisher and put the fire out. He said the fire lasted between 2-5 minutes. He then cooled the air compressor "A" with a water hose.

 