Environmental Program: Branch of Environmental Assessment (BEA)
Offshore Energy and Minerals Management Program Home Page
Renewable Energy Program
5-Year OCS Leasing Program
Virginia Sale 220
Leasing Moratorium Information
2006 National Assssment
2006 National Assessment Map
Past 5-Year Programs
Atlantic Seismic EIS
Coastal Impact Assistance Program
Jobs
GOMESA Revenue Sharing
Environmental Program Home Page
Branch of Environmental Assessment
National Environmental Policy Act (NEPA)
Environmental Studies Program
Coastal Impact Assistant Program
Oil Spill Modeling Program
MMS Ocean Science
Environmental Studies Program Information System (EPSIS)
Scientific Committee
Teal Spacer

 
 Content:
   Dirk Herkhof

 Pagemasters:
    OEMM Web Team


Teal Spacer

Photo of wind turbines in deep waterPhoto of a fishPhoto of a wetlandPhoto of a platform with three boatsPhoto of a killer whalePhoto of a welder working on an offshore platformPhoto of a platform in water and behind a snowy mountainPhoto of three oil refinery faucetsPhoto of a wind energy farm
    Environmental Program
 
Branch of Environmental Assessment (BEA)

National Environmental Policy Act - Environmental Assessments

Federal Agencies must prepare Environmental Assessments (EAs) for proposed actions in accordance with National Environmental Policy Act regulations (40 CFR 1500-1508).  An EA analyzes the environmental effects of a proposed activity to determine the significance of potential impacts.  Any significant impacts identified in an EA must be analyzed in an Environmental Impact Statement (EIS).  An EA also documents the potential environmental impacts of proposals that do not require an EIS, and identifies as early as possible mitigation measures that BOEMRE may require to avoid or minimize adverse effects of a proposal

We assume that the proposal evaluated in an EA includes mitigation required by lease stipulations, regulations, other Federal and State environmental laws, and specific measures committed to in writing by the lessee, operator, or applicant prior to completion of the EA.  Mitigation measures not identified in the proposal may be evaluated in the EA to determine whether such measures, if approved as part of the proposal, would reduce impacts to a less-than-significant level.

bullet When to Prepare an EA
bullet Responsibilities for an EA
bullet Contents of an EA
bullet EA Procedures  

Recent Environmental Assessments

bullet Increased Safety Measures for Energy Development on the Outer Continental Shelf
bullet Modifications to Suspension of Deepwater Drilling Operations

 

Last Updated: 10/18/2010, 01:14 PM Central Time